+966 3 817 3040

Phone number

Dammam 31516, KSA

Address location

Sewage networks in al- hasa (phase I)

CONTRACTOR: ALDEWANIYAH CONSULTANT

EXECUTION PERIOD: 36 MONTHS AH

PROJECT COMPONENT:

  • TO INSTALL THE GRAVITY LINES FORM 200 MM TO 600
    MM DIAMETERS WITH TOTAL LENGTH OF 40,854
    KILOMETERS.
  • CONSTRUCTION OF THREE (3) PUMPING STATIONS
  • TO INSTALL FOUR (4) DISCHARGE LINES OF 600 MM, 0.400
    MM, 250 MM, AND 200 MM DIAMETERS WITH TOTAL
    LENGTH OF 13.4 KILOMETERS.
  • DEVELOPMENT OF SEVEN (11) PUMPING STATION IN
    THE VILLAGES.
  • INSTALLATION OF HOUSE CONNECTIONS

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top