CONTRACTOR: ALDEWANIYAH CONSULTANT
EXECUTION PERIOD: 36 MONTHS AH
PROJECT COMPONENT:
- TO INSTALL THE GRAVITY LINES FORM 200 MM TO 600
MM DIAMETERS WITH TOTAL LENGTH OF 40,854
KILOMETERS. - CONSTRUCTION OF THREE (3) PUMPING STATIONS
- TO INSTALL FOUR (4) DISCHARGE LINES OF 600 MM, 0.400
MM, 250 MM, AND 200 MM DIAMETERS WITH TOTAL
LENGTH OF 13.4 KILOMETERS. - DEVELOPMENT OF SEVEN (11) PUMPING STATION IN
THE VILLAGES. - INSTALLATION OF HOUSE CONNECTIONS