CONTRACTOR: ALDEWANIYAH CONSULTANT
EXECUTION PERIOD: 24 MONTHS AH
PROJECT COMPONENT:
- TO INSTALL THE GRAVITY INES ROM 200 MM TO 600 MM
DIAMETERS WITH TOTAL LENGTH OF 2,955 METERS. - MAIN PUMPING STATION
- DISCHARGE LINE OF 500 MM WITH THE LENGTH OF 6.7
KILOMETERS. - INSTALLATION OF HOUSE CONNECTIONS