CONTRACTOR: ALDEWANIYAH CONSULTANT
EXECUTION PERIOD: 36 MONTHS AH
VMPSC
- TO INSTALL THE GRAVITY LINES FROM 200 MM TO 900 MM
DIAMETERS WITH TOTAL LENGTH OF 61.971 KILOMETERS. - CONSTRUCTION OF TWO (2) PUMPING STATIONS
- TO INSTALL THREE (3) DISCHARGE LINES OF 250, 400
AND 600 MM DIAMETERS WITH LENGTH OF 17.20
KILOMETERS. - DEVELOPMENT OF SEVEN (7) PUMPING STATION IN THE
VILLAGES. - INSTALLATION OF HOUSE CONNECTIONS