+966 3 817 3040

Phone number

Dammam 31516, KSA

Address location

Expansion and development of sewage networks in al- hasa (phase I)

CONTRACTOR: ALDEWANIYAH CONSULTANT

EXECUTION PERIOD: 36 MONTHS AH

VMPSC

  • TO INSTALL THE GRAVITY LINES FROM 200 MM TO 900 MM
    DIAMETERS WITH TOTAL LENGTH OF 61.971 KILOMETERS.
  • CONSTRUCTION OF TWO (2) PUMPING STATIONS
  • TO INSTALL THREE (3) DISCHARGE LINES OF 250, 400
    AND 600 MM DIAMETERS WITH LENGTH OF 17.20
    KILOMETERS.
  • DEVELOPMENT OF SEVEN (7) PUMPING STATION IN THE
    VILLAGES.
  • INSTALLATION OF HOUSE CONNECTIONS

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top