CONTRACTOR: ALDEWANIYAH CONSULTANT
EXECUTION PERIOD: 30 MONTHS AH
PROJECT COMPONENT:
- TO INSTALL THE GRAVITY LINES FROM 250 MM TO 700 MM
DIAMETERS WITH TOTAL LENGTH OF 3,464 METERS - PUMPING STATION SC1
- TO INSTALL DISCHARGE LINE OF 500 MM WIT THE LENGTH
OF 4.7 KILOMETERS (THREE(3) VALVES CHAMBER)