CONTRACTOR: ALDEWANIYAH CONSULTANT
EXECUTION PERIOD: 36 MONTHS AH
PROJECT COMPONENT:
- TO INSTALL THE MAIN GRAVITY LINES FROM 200 MM TO
1,000 MM DIAMETERS WITH TOTAL LENGTH OF 5,710
METERS - MAIN PUMPING STATION SC2
- TO INSTALL DISCHARGE LINE OF 500 MM OF LENGTH OF12.8
KILOMETERS WITH SEVEN (7) VALVES CHAMBERS