+966 3 817 3040

Phone number

Dammam 31516, KSA

Address location

Sewage treatment plant in qatif

CONTRACTOR: ALDEWANIYAH CONSULTANT

EXECUTION PERIOD: 44MONTHS AH

PROJECT COMPONENT:

  • Aeration Tank (Two Tanks)
  • Clarifier (Four Tanks)
  • Thickener(Two Tanks)
  • Screw Pump
  • Drain Pumps Station
  • Sludge Pumps Station
  • Filter Pumps
  • Collar Building
  • Generators Room
  • Transformer Building
  • Sludge Building
  • RC Fence
  • Toilets.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top