CONTRACTOR: ALDEWANIYAH CONSULTANT
EXECUTION PERIOD: 42 MONTHS AH
PROJECT COMPONENT:
- INSTALLATION OF WATER NETWORKS FROM 100 MM TO 200
MM DIAMETERS WITH TOTAL LENGTH OF 57,770 METERS. - CONSTRUCTION OF TEN (10) ELEVATED TANKS IN
ABOUNDON PLACE IN AL-HASA AND ABQAIQ